V1.4 SP 33.0

From FPDS-NG

Schedule

DescriptionStart Date End Date
BETA Installation January 9, 2017January 9, 2017
Government Acceptance Testing January 24, 2017January 26, 2017
Installation in ProductionFebruary 3, 2017February 3, 2017

Document Changes

DocumentationChanges Required
XML SpecificationsNo
Web ServicesYes
Data DictionaryYes
NASA Specific Data DictionaryNo
Use Case SummaryNo
Validation RulesYes
ReportingNo
ezSearchNo
Atom FeedsYes
Online HelpNo
User ManualYes

SPR Listing

SPR #Enhancement/ProblemSolutionImpact to Users and Integrators

IAESAM-39
IAESAM-38
RTC-14887
RTC-14886

This enhancement will add the “CAGE code” to the ATOM Feeds and the Ad-Hoc Reports The “CAGE Code” data element will be added in the new Atom Feed version 1.4.5 and will be available in the AdHoc Reporting tool. Yes

IAESAM-339
RTC-24710

This enhancement will add the data elements “Approved By”, “Referenced IDV Type", “Referenced IDV Multiple or Single”, and “Referenced IDV Part 8 or Part 13” to the new version of the Atom Feeds. The data elements “Approved By”, “Referenced IDV Type”, “Referenced IDV Multiple or Single”, and “Referenced IDV Part 8 or Part 13” will be added in the version 1.4.5 Atom Feed. Yes

IAESAM-392
RTC-26650

This enhancement will add the data elements “Approved Date” and “Approved By” not included in the Atom Feeds.

The “Approved Date” and “Approved By” data elements will be added to the version 1.4.5 ATOM feed.

Yes

IAESAM-389
RTC-26651

The name of the Data Element “GFE/GFP Provided Under This Action” does not match the latest FAR requirements for reporting. This data element identifies whether or not Government Furnished Equipment (GFE) or Government Furnished Property (GFP) was utilized on the contract action. The screen name of the Data Element “GFP/ GFP Provided Under this Action” will be changed to “GFP Provided Under This Action”. The values allowed in the drop down list will be updated as follows:

Current dropdown values are:
• Transaction does not use GFE/GFP
• Transaction uses GFE/GFP

Updated dropdown values are:
• Transaction does not use GFP
• Transaction uses GFP

No

IAESAM-126
RTC-31827

FAR Case 2014-015 Consolidation of Contract Requirements Phase 1 1. The data element “Consolidated Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it.

With the FAR Case 2014-015, the following changes will be effective starting on the Production deployment date of Service Pack 33 (2/3/2017):
• This Dollar Threshold condition no longer applies
• New values have been added to the Consolidated Contract data element:
Y = Yes - This value can only be selected when the "Date Signed", on the action, is on or earlier than February 2, 2017
N = No - This value can only be selected when the "Date Signed", on the action, is on or earlier than February 2, 2017
A – Consolidated Requirements - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017
B – Consolidated Requirements with Written Determination - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017
C- Consolidated Requirements Under FAR 7.107-1(b) Exception - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017
D - Not Consolidated - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017

2. The data element “Bundled Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it.

With the FAR Case 2014-015 the following changes will be effective starting on the Production deployment date of Service Pack 33 (2/3/2017):
• The Dollar Threshold condition no longer applies to the existing values
• New values have been added to the "Bundled Contract" data element:
A = Mission Critical - This value can only be selected when the "Date Signed", on the action, is on or earlier than February 2, 2017
B = OMB Circular A-76 - This value can only be selected when the "Date Signed", on the action, is on or earlier than February 2, 2017
C = Other - This value can only be selected when the "Date Signed", on the action, is on or earlier than February 2, 2017
D = Not a Bundled Requirement - This value can only be selected when the "Date Signed", on the action, is on or earlier than February 2, 2017
E = Bundled Requirements - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017
F = Substantially Bundled Requirements - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017
G = Bundled Requirements Under a FAR 7.107-1(b) Exception - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017
H = Not Bundled - This value can only be selected when the "Date Signed", on the action, is on or later than February 3, 2017


Yes
RTC-32176 There is no central location for the “DoD Claimant Program Code” reference list. The FPDS-NG worksite will be updated to include the “DoD Claimant Program Code” reference list in the “Reference” section with the PSC, NAICS and more:

https://www.fpds.gov/wiki/index.php/PSC%2C_NAICS_and_more

When clicking on “PSC, NAICS and more”, the “DoD Claimant Program Code” reference will be included in the list.

No