Difference between revisions of "V1.5 SP 18.0 August Fast Path"
From FPDS-NG
(Created page with "==Schedule== <TABLE id="box-table-a" border=2> <tr><th width=30% align="center"><b>Description</b></th><th width=34% align="center"><b>Start Date</b></th> <th width=34% align...") |
|||
Line 3: | Line 3: | ||
<tr><th width=30% align="center"><b>Description</b></th><th width=34% align="center"><b>Start Date</b></th> | <tr><th width=30% align="center"><b>Description</b></th><th width=34% align="center"><b>Start Date</b></th> | ||
<th width=34% align="center"><b>End Date</b></th></tr> | <th width=34% align="center"><b>End Date</b></th></tr> | ||
− | <tr><td nowrap>Beta Deployment</td><td nowrap> | + | <tr><td nowrap>Beta Deployment</td><td nowrap>August 7, 2023</td><td nowrap>August 7, 2023</td></tr> |
− | <tr><td nowrap>Government Acceptance Testing </td><td nowrap> | + | <tr><td nowrap>Government Acceptance Testing </td><td nowrap>August 14, 2023</td><td nowrap>August 18, 2023</td></tr> |
− | <tr><td nowrap>Production Deployment </td><td nowrap> | + | <tr><td nowrap>Production Deployment </td><td nowrap>August 26, 2023</td><td nowrap>August 26, 2023</td></tr> |
</table> | </table> | ||
Latest revision as of 16:41, 5 February 2025
Schedule
Description | Start Date | End Date |
---|---|---|
Beta Deployment | August 7, 2023 | August 7, 2023 |
Government Acceptance Testing | August 14, 2023 | August 18, 2023 |
Production Deployment | August 26, 2023 | August 26, 2023 |
Document Changes
Documentation | Changes Required |
---|---|
XML Specifications | Yes |
Web Services | Yes |
Data Dictionary | Yes |
NASA Specific Data Dictionary | No |
Use Case Summary | Yes |
Validation Rules | Yes |
ezSearch | Yes |
Atom Feeds | Yes |
Online Help | Yes |
User Manual | Yes |
SPR Listing
SPR # | Enhancement/Problem | Solution | Impact to Users and Integrators | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
IAEMOD-15731/IAEPOL-9 |
Per FAR Case 2017-09, in support of the updates to the policy changes on the Joint Ventures program FPDS will add two new Entity Socio Economic Indicators.
The two new Entity Socio Economic Indicators are:
|
FAR Case 2017-019:
Policy on Joint Ventures.
Three existing Entity Socio-Economic Indicators will be renamed as follows:
In FAADC, the three new Entity Socio-Economic Indicators will be renamed as follows:
In FAADC, the two new Entity Socio-Economic Indicators will be stored in generic strings as follows:
Existing validations will be updated to reflect these new values. |
Yes | ||||||||
IAEMOD-15732/IAEPOL-10 |
Per FAR Case 2020-013, in support of the Small Business Administration’s Women-Owned Small Business (WOSB) program, FPDS will add (2) new Entity Flags:
| FAR Case 2020-013: Certification of Women-Owned Small Businesses.
Two existing Entity Socio-Economic Indicators will be renamed as follows:
In FAADC, the two new Entity Socio-Economic Indicators will be stored in generic strings as follows:
Existing validations will be updated to reflect these new values. |
Yes | ||||||||
IAEMOD-15734 /IAEPOL-28 |
The 2019 NDAA requires that DoD deploy a pilot program that allows the Department to count Employers of Persons with Disabilities toward small disadvantaged business goals at both the contract and subcontract levels.
| Collect data for DoD Pilot Program per NDAA for Eligible Employers of Persons with Disabilities.
|
Yes | ||||||||
IAEMOD-16014 |
Defect: Product Service Codes that start with a number and also contain an alpha character are not recognized as a product, causing incorrect behavior of Validation Rule 6T07.
This defect is allowing users to approve contracts with both a PSC for a product (such as 7A20) and an IGF value. | IGF rule incorrectly does not fire when PSC is for a product code but contains an alpha character.
|
Yes | ||||||||